Journal article 241 views
Design and implementation of a Drum-Buffer-Rope pull-system
Production Planning & Control, Volume: 26, Issue: 6, Pages: 489 - 504
Swansea University Author:
Andrew Thomas
Full text not available from this repository: check for access using links below.
DOI (Published version): 10.1080/09537287.2014.926409
Abstract
Design and implementation of a Drum-Buffer-Rope pull-system
Published in: | Production Planning & Control |
---|---|
ISSN: | 0953-7287 1366-5871 |
Published: |
Informa UK Limited
2015
|
Online Access: |
Check full text
|
URI: | https://cronfa.swan.ac.uk/Record/cronfa66957 |
Keywords: |
pull-system; Drum-Buffer-Rope (DBR); shared resources; lean; theory of constraints (TOC) |
---|---|
College: |
Faculty of Humanities and Social Sciences |
Issue: |
6 |
Start Page: |
489 |
End Page: |
504 |